Airbus A-400M (previously known by the name of the next major aircraft), known as the needs of the Air Force Atlas Britain, France, Turkey, Spain, Germany, Italy and Belgium to a long-range transport aircraft with moveable top companies Airbus designed and developed. In 1993, the general features set design and package deal between the 7 participating country fell after Italy withdrew from the project, the number of participating countries to reach the 6 countries. Airbus Military SL in Madrid, one of the subsidiaries of European Airbus Industries, manage, bo i nyköping and track the development of A-400M aircraft Other companies involved in this project are the UK's BAE Systems, EADS company from Germany, France and Spain Company Flabl of Belgium and aerospace Tusas of Trkyh.ps of construction companies mentioned various components and systems, final assembly takes place in Seville, Spain.
In May 2003, a contract between Airbus and Europe Logistics Agency (OCCAR) to produce 212 aircraft are closed Shd.kshvrhay France, Britain, Spain, Turkey, Germany, bo i nyköping Luxembourg (who recently bo i nyköping joined the project) and Belgium this Italy signed the contract, but later withdrew the proposal has ordered 212 aircraft to 180 aircraft Yabd.thvyl loss of the aircraft started in 2009 and will continue until 2020 surveys in January 2005, the cuts metal for A-400M was carried out on the assembly began in 2007.
In June 2008, the aircraft made its first flight Dad.bh second flight was delayed due to problems in the engine, and finally on 11 December 2009. In the test flight, the aircraft weight of 127 tonnes, the experimental equipment weight weighing 2 tons to 15 tons of water tanks with a maximum takeoff weight of the aircraft Dasht.bh bo i nyköping officially declared Ast.antzar bo i nyköping 141 tons in the first quarter of 2013 is the first aircraft to be delivered to the French air force and deliver the orders 2025 end.
In January 2009, Airbus delivered the first batch of A-400M aircraft will be postponed until 2012 and said to be looking for new ways to advance the large transport aircraft. In the same year the cost of the out of the the amazing figure of 11.2 billion dollars Shd.shrkt Airbus announced a $ 5.2 billion if not inject money into the project, it will be next to Gzasht.sr out in November 2010, Belgium, Britain, France, Turkey, bo i nyköping Germany Spain and Luxembourg have agreed to provide $ 1.5 billion for the Airbus project to pursue and develop Dhd.dr while Germany and the UK, the number of aircraft ordered to 53 Kastnd and 22 Ferund uh The total number of aircraft ordered lowered to 170 aircraft.
The first A-400M known by the name MSN1 In April 8, 2010, the second production aircraft (MSN2) flight test Krd.hvapymahay completed their third and fourth respectively in the July 9, 2010 and December of the same year their flight test Rsandnd.hvapymahay finished first, third and fifth production (MSN1, MSN3 and MSN5) Oral Reading and Number flights in Toulouse, France, while the second and fourth planes (MSN2 and MSN4) test flight in Seville, Spain, where the Toulouse weather is better and more flexible Antaf Dadnd.lavh plane to do it in 2010, A-400M aircraft in the largest aviation event in Berlin, Germany, England and the exhibition of aerial was exhibited Farnbvrg .
As noted earlier, 170 aircraft are ordered by 7 countries participating in the plan, but only 7 countries mentioned, Malaysia also wants to hire 4 A-400M aircraft, which can cause is set to 174 aircraft ordered aircraft Brsd.ba The account states that the aircraft are ordered from Great Britain (22 aircraft), Belgium (7 units), Turkey (10 aircraft), bo i nyköping Luxembourg (1 F), France ( 50 units), Germany (53 aircraft), Spain (27 aircraft) and Malaysia (4 units).
In April 2005, the South African Air Force wants to join together in an agreement with Airbus A-400M aircraft was participating countries. Under the agreement, Airbus should be between 2010 and 2014 10 A-400M aircraft will be delivered to the country. But four years later, in November 2009, South Africa was canceled. In December 2005, Malaysia bo i nyköping in order to collect 4 aircraft A-400M aircraft joined buyers.
The design of the aircraft composite materials are widely used. With the ability to carry on a higher plane of existence known as the C-130 Hercules bo i nyköping transport aircraft C-160 Transal or the design of the aircraft is the take-off bo i nyköping bands short and half are considered the A-400M has 12 wheels on the body, 2 wheels on the nose.
One of the main tasks of modern transport aircraft fired weapons, food, bars and paratroopers. For this launch is needed to fly the aircraft carrier and speed are very few aircraft. In the capacity A-400M included the aircraft bo i nyköping could throw at low speeds to various loads and high speed in minimum time, thereby carrying out missions bo i nyköping in Mission requisite flexibility of modern transport aircraft.
Evil
No comments:
Post a Comment